How to add coolant after the new diesel generator set is in place?

release:2024-10-22 Hit:445

1. After the diesel generator set is in place, do not add coolant too quickly, otherwise the gas in the engine water jacket will not be easily discharged, resulting in high water temperature during engine operation.

2. After filling up the coolant, stop the engine for inspection after it heats up, and refill until it is full.

3. If the engine is equipped with an intercooler, the air release valve on the intercooler must be opened when filling.

4. The replacement cycle for rust and antifreeze is two years.

5. During winter, it is necessary to check the concentration of rust and antifreeze solution; It is strictly prohibited to use water as a substitute for rust and antifreeze; Before using rust proof and antifreeze for old engines, the cooling system should be cleaned.

The above are the precautions for adding coolant. Professional diesel generator manufacturer, service hotline; 13390652728/18252536005, please feel free to contact us for consultation at any time.


copyright@2020-2021 Jiangsu Province Suanma Power Equipment Co., Ltd.

 Jiangsu Province Suanma Power Equipment Co., Ltd. is a professional generator manufacturer, diesel generator set manufacturer, silent generator set supplier, and mobile power station manufacturer. We specialize in producing generators, diesel generator sets, silent generator sets, and mobile power stations. We are the most professional, authoritative, and reliable diesel generator set sales website in China.

Record number: 苏ICP备12029014号-4
 
QQ
Sales Hotline
13390652728